What is the lead time for bulk products from PairGears?
- Share
- Issue Time
- May 9,2024
For OEM repeat parts with existing tooling/fixtures, our typical production cycle is about 15 days.
For custom gears requiring new tooling, samples usually take ~30 days, and mass production typically takes 15–30 days, depending on specifications and approval steps.
What this lead time covers
In practice, the stated lead time is mainly about order processing + picking/packing (for stock) or production + inspection (for non-stock), followed by shipment release.
If you need “door-to-door arrival time,” that will additionally depend on shipping mode and Incoterms.
What the timeline depends on
• Inventory status & part mix (all items in stock vs partial stock)
• Order volume & packaging requirement (carton vs pallet/crate)
• Inspection/document scope (e.g., standard release vs extra inspection pack)
• Shipping terms & destination (FOB/DDP affects who arranges which leg)
How we keep bulk orders on schedule
• Stock orders: confirmed part list → pick/pack → labeling/traceability → shipment release
• Non-stock orders: drawing/spec lock → production route → in-process checks → final inspection → QA release
We share progress and flag any risks early so you can keep your downstream plan stable.
Typical Timelines
| Order Type | Quick reference table | Notes |
| Bulk products with inventory | Ship within ~1 week | Depends on quantity + packing + release docs |
| Bulk products without inventory | ~30 days | Depends on process route + inspection scope |